InvestorsHub Logo

tryoty

08/29/12 5:42 PM

#264398 RE: mz157 #264394

Best guess... a year to to do a gravity study and analyze the results... another year to shoot seismic and analyze the best prospects... if things look good, another year to attract and negotiate contracts with partners.... year 4 to build a road to the drill sites (there is ONE road through that block... drilling commences in year 5.

I don't like that timeframe either, but there is a LOT of work to do, and it needs to be done in conjuction with the work going on with ERHC's other blocks.