InvestorsHub Logo

Bronco1973

06/07/12 1:02 PM

#33417 RE: tdbowieknife #33415

Once again, pick up the phone and it will yield a wealth of information.

Treaty will first drill through the obstruction below 1200 feet and likely drill down to around 1400 feet. Next, the wireline operation will occur. All of this will likely only take 1-2 hours. The wireline results will be presented to the GOB then the well casing will be installed and commercial operations commence.

This isn't rocket science.

yogowypi

06/07/12 1:57 PM

#33430 RE: tdbowieknife #33415

You cannot wireline a well after it has been cased.



You Are Wrong! All you have to do is run a Cased Hole Log.

Open Hole logs are run before the casing is set.

Get your facts straight before you present them.

ORILEY

06/07/12 2:35 PM

#33437 RE: tdbowieknife #33415

Treaty will wire line as soon as the well is cleared prior to casing the well.No oil no casing just cement.
You are wrong on the wire line after casing though.It is called cased hole logging and Treaty possesses the equipment to do that and you would know that if you asked!

arstegall

06/07/12 5:17 PM

#33457 RE: tdbowieknife #33415

You call yourself an oil man, please explain. The oil company I work for is running wireline this very moment and this well is cased and been in production for almost 1 year. The well makes 331bbls of oil, 121bbls of water and 1326mcf per day, I am looking at the latest test on the production report as I type. We have also ran logs on the well while it is being produced. Please explain you comment that you can not wireline a well after it has been cased.