InvestorsHub Logo

Stayahead

05/25/12 7:52 AM

#8932 RE: TinkerBelle #8931

This is getting better every day. When the S-1 gets through the SEC I think we are off to the moon.

Gotta love this whole thing. Going to make a lot of us LONGS very wealthy.

ShortonCash

05/25/12 10:24 AM

#8933 RE: TinkerBelle #8931

The KATX exploring boys have got their EY YA on_some_Mining_Toys New Roads and new Toys
Looks like the Boys at the EKOM Ye Ya are getting some new toys..complete package with pumps and generators....



http://0053d99.netsolhost.com/Brochure/Goldfield%20Does%20It%20All.pdf

hundred yards per hour


<<< 1 Goldfield Engineering 'Alaskan' 100yph Gold recovery system $240,000




http://www.goldfieldeng.com/Brochure/Alaskan%2050%20-%20250.pdf">http://www.goldfieldeng.com/Brochure/Alaskan%2050%20-%20250.pdf" />





Use of Funds
KAT Gold is seeking $7.3 million in order to launch operations in Ghana. The majority of the budget is to establish operations on the Ekom Eya property. KAT Gold may use some of the operating capital to secure additional mining opportunities.
Equipment
Budget
Heavy Equipment
2 Caterpillar 330DL Excavators @ $465,000 each.
$930,000
1 D8T Crawler Bulldozer $695,000
1 980H Wheel Loader $475,000
1 963 Crawler Loader $225,000
Miscellaneous Heavy Equipment $125,000 Crushing and Grinding Equipment
1 SBM 100-120 Mobile Crushing and Screening Plant $418,000
1 SBM Hammer Mill $248,000
3 X 50' Conveyors $180,000
Miscellaneous Crushing and Grinding Equipment $140,000 Gravity Recovery Equipment
1 Goldfield Engineering 'Alaskan' 100yph Gold recovery system $240,000
3 Holman/Wilfly 16' Mineral Tables $114,000
Miscellaneous Recovery Equipment $135,000 Vehicles
2 Volvo 6X6 Ore trucks $300,000
3 Nissan 'Hardbody' Pick-ups $90,000
1 General Duty Service Truck $72,000 Generators 1X100kva Perkins Diesel.
$35,000 1X 50kva Perkins Diesel
$28,000 Miscellaneous small generators
$15,000 Pumps 2X 8"X6" Diesel Pumps
$60,000 Miscellaneous small pumps
$22,000 Miscellaneous Hoses and Fittings
$8,000 Man Camp
1X 20 Man Camp, Complete.

I like the exploring boys buying mining toys....

ShortonCash

07/30/12 12:52 PM

#9894 RE: TinkerBelle #8931

There was one road and now it appear there is a second road the completion of the road that went through the pits at Walsh and Strauss and now it goes directly to the EKOM EYA and the Leaching tanks at The Bibiani main plant....



Power and second road are most likely in place..read the rest of Tinks post.



Donkoto is right where the "N" is where it says Bibiani North on map.