InvestorsHub Logo
icon url

Drunken Sailor

04/13/12 7:18 AM

#24797 RE: oilsleuth #24789

Thanks for keeping things honest. I certainly would not want to be responsible for misleading anyone.

The pre-collar hole has already drilled through the hard dolerite and the rock sequence to be drilled by an oil rig (one of the several we are assured are on the way!) is expected to be entirely sedimentary rock. It is possible more dolerite could be encountered at depth but it is unlikely. See the Bellevue hole section at the website.



So who can add the whole thing up. Get a rig to Tasmania, Get it set up and inspected and then drill through 2800 of sedimentary rock, given that some of the hardest yards have already been done previously.

There is no way now that GSLM could drill Bellevue and Thunderbolt



That has been true for many weeks now, but is it still possible to just drill Bellevue?