Wouldn't it be something if all 4 veins were connected under the overburden and were just the tips up a MEGA UPLIFT! Say we strike IRON 10-20 meters down on the new drill holes and this continues all the way over to the next named vein and it goes in all directions to the other exposed veins! WOW Something tells me BAHA 14 is BIGGER then most have taken the time to consider! Is it possible?