Re: CNYC these are high grade returns
16,250,000 tons at an average grade of 0.43% Cu, and inferred mineral resource estimate, at cut-off grade of 0.2% copper, of 2,900,000 tons at an average grade of 0.31% Cu
.2%Cu is good enough to support a mine if the infrastructure build-out is within reason.
Holding this one for the long term, easy money