OH YES!! Absolutely CORRECT!! The machine is bigger as a result of the addition of the pre melt but a bunch of other equipment has been eliminated as the design has improved....hence 2 machines in the original building and i think a 3rd will fit...at any rate we have 2 running and a 3rd being assembled.....PROITABLE times straight AHEAD!!....just assemblin'