So when was the last time you were at the factory?
So this is what you consider top notch??
Those of us on the "basher" side of the fence have also been to the factory. This is what we have been able to find out:
1)We have been able to confirm there are only a few admin staff in the entire 24,000 square feet facility. 2) We have confirmed Humanim pulled out all of the factory workers. 3) We can confirm there is no assembly taking place. There are only two small assembly lines in the factory and does not even appear the lines are set up to operate. Two small assembly lines means very little production capacity if SavWatt were ever to start production. 4) We can confirm there are no contracts SavWatt has been awarded and very little inventory in the factory to deliver product.
We are still waiting for the 170 employees to be hired by the end of 2011...as stated in the December 2010 article: