This corporate presentation make thinks globally more
comprehensive but there is several point still not clear for me :
Anybody may help with that?
estimated production:
=====================
Page 11 and 12 :
If at end of 2011 Exit includes: Cheal-A1, A3, A7, A8; Cheal-B3, BH-1, B4ST, and B5, Cheal-C1, SW-1, SW2, SW3, and SW4
It might be a cumulated production (gaz + oil in boe/d) of :
5065 (The 4 SW)
+ 1870 (B5)
+ 740 (A8)
+ 240 (C1)
+ 400 B4ST
= 8315 boe without BH1 and A1 A3 A7 +B3
I know boe/d might be misleading but that's the double
the announce 4000 boe by end 2011.K
Is it just conservative estimation or production limitation?
Plus in march B6? + B1?+B2? + C2 (2333 BOE/d)
= 10648 boe/d without BH1+A1 A3 A7 +B3+B5+B1+B2
Waterflood point :
==================
What well are really part of this program :
A1 A3 A7 +B3 due to end of 2011
+ B1 and B2 end of March ?