In this instance, the TSH Biomass Power Plant is dependant upon the KDS MF-777. Testing is complete.............the machine works fabulously for this application. There is NO testing to be done. The KDS is in operation 24/7..........and it is an integral part of their facility. Here the KDS was the key in solving their biomass preparation problems.

This is the REALITY of the situation.....
http://www.fasc.net/images/KDSMF-777-2.jpg
Take a good look manos........ palm waste is being fed by conveyor into the machine..............processed palm waste is then taken by conveyor from the KDS to their steam boiler.....

No testing, no year to pass...........and more than one machine will be utilized.