InvestorsHub Logo
icon url

mayhem1

10/01/11 11:16 PM

#26050 RE: M_T_Pockets #26048

So basically no time soon for permit.Lab takes awhile then aerial photos,design plan and drawn up contract.Looks to me that the permit while not contingent on actual dry stack being built may in actuality be what will be needed to get this permit.JMO