They are producing and accumulating as we speak. Those 30 OZs were to fine tune the equipment at the mine. The inspectors gave the OK and they are sifting, and it is looking golden. Their machinery is in operation mode rather than in the developing stage.
They are well past getting the equipment out of the boxes and attaching the screws to the geotubes, I would think that the heavy machinery operators know how to use it properly and are not recently licensed with no job experience.imo
When they announce the new amount of recovered gold, we will not be at these levels.imo
GLTA