InvestorsHub Logo
icon url

the big guy

07/13/11 10:34 PM

#119317 RE: Rawnoc #119314

actually it is you who are dead wrong. The cost of the P2o machine includes all of the labor that goes into building the machine as well. That is all part of capital cost. If you look at my posts, you will see that I have always acknowledged that there is a piece of process equipment, the "processor" that I chose to be priced at 250k. Other equipment would bring the total figure for equipment up to 400 of 500k. Exactly what the books say. The books are accurate. The interpretation in your post is not accurate.

No matter what anybody says, the Capital Cost for a P2O installation is between 1 and 2 Million.