InvestorsHub Logo
icon url

Rawnoc

07/12/11 10:46 PM

#118955 RE: Commando911 #118949

Scary....

The barriers of all landfills will eventually break down and leak leachate into ground and surface water. Plastics are not inert, and many landfill liners and plastic pipes allow chemicals and gases to pass through while still intact.16
In 2008, a survey of landfills found that 82 percent of surveyed landfill cells had leaks, while 41 percent had a leak larger than 1 square foot.16
Newer, lined landfills leak in narrow plumes, making leaks only detectable if they reach landfill monitoring wells. Both old and new landfills are usually located near large bodies of water, making detection of leaks and their cleanup difficult.16
Incinerators are a major source of 210 different dioxin compounds, plus mercury, cadmium, nitrous oxide, hydrogen chloride, sulfuric acid, fluorides, and particulate matter small enough to lodge permanently in the lungs.
 
In 2007, the EPA acknowledged that despite recent tightening of emission standards for waste incineration power plants, the waste-to-energy process still “create significant emissions, including trace amounts of hazardous air pollutants.”

http://www.cleanair.org/Waste/wasteFacts.html
icon url

Justice37

07/12/11 11:03 PM

#118957 RE: Commando911 #118949

Took their marketing department 6-7 years to get things rolling. Just to clarify, after 7 years, there is only 1 Agilyx processor built and it only produces 10 tons of plastic per day. Anyone here really think it'll take more than five years for two year old JBI to have their second processor up and running. Can you imagine what JBI's marketing department will be like in five years.