So now we all should understand that we do not have a machine capable of producing that amount of concentrate in 2 hours. The geological reports is based on grams of gold per ton of material processed. This is the standard for calculations in the industry. How many dredges do we have , and what is their processing capacity? Looks good to me.
Zimmi site should provide much better chance of producing higher amount of gold for SGCP than BO. The gold finding there, 2.64g/t, from plain sample collection offers huge potential with just 2 dredges. I would assume the fifth dredge will be moved to Zimmi.