I would rather we keep a spare dredge at that spot to prevent down time for maintainance than put a dredge at another spot. We found the cow, its milking time.
Those numbers are insane. That 170g/t is on the shore line but they are projected to pull multiples of that further from the shore. My rough numbers are:
170grams = 5.4troy oz.
5.4oz x 6hr work day = 32.4oz/day
32.4oz x 150 mining days= 4860oz
4860oz x $1300/oz of gold = $6,318,000 season
I dont know if the sample was done with 1 or more dredges. If it was indeed done with only 1 dredge RGI is gonna need its own RGI:)