Vega is back? How long are you going to claim that this is not a scam? By the end of last year they should have completed a plant in Tifton, GA. With the contracts with ECEM they should have had a channel to sell all the bio-coal produced at the Tifton plant.
Except that the contract with ECEM was nothing but Letter of Intent (LOI), which was never signed by Vega. Molen has no technology to use torrefaction in bio-coal production. He is a total moron, who can only excell in writing these bullshit press releases.
What do you base you arguments on, uptick? "Vega is back", "Go Vega go" are the only arguments you have been able to present so far.