TRCPA: Don't forget another little thing, testing (wink, wink). The machine is being built? What did they do, order the iron ore for the steel?
There's a little thing called research, design and engineering that had to take place before the new machine was built, along with about $500K in funding.
The wait for all that is over, as the machine is currently being built.