InvestorsHub Logo

b4atf

01/02/11 11:04 AM

#45342 RE: pennyRus #45341

The first dredge has been positioned in the water and operations are commencing. The second dredge will be in place and operational by mid December with the balance of dredges scheduled to be in operations by the first of the New Year.

From the last FR.

1/15 is the expectation but not a guarantee.
b4

small time investor

01/03/11 12:47 PM

#45371 RE: pennyRus #45341

John stated "The 100 ton dredge will be placed in Suliman" (Check spelling)