<quote from PR> Results have been received for the upper section of the drill hole from 30 to 40.1m. </quote from PR> So from the original 344 meters drilled, we're still awaiting the results of 334 meters (well, 333,9 meters to be exact).
It would seem that hole 1 has been analysed since it is stated that there is uneconomic copper but the details have not been reported. The reason why is everybody's guess. My personal guess is that the numbers were discouraging. Companies do not like to publish negative numbers.
We all seem to have forgotten the Rusty Ridge drill results. Thanks for the post to remind us about that. Based on the partial results, so far REE result looks excellent Except for rubidium: 0.022% TREO, all the rest of REE elements are mineable at todays standard, which is 0.03% REE required mineable. Excellent post. Thank you.