InvestorsHub Logo

Doc Will

12/22/10 12:56 PM

#1094 RE: geopressure #1090

CASING PROGRAM MAY LIMIT DEEPER DRILLING

Recall, "As of October 25, 2010, the Burkley-Phillips No.1 well was drilled and cased to a depth of 17,872 feet." Well above their initial planned casing depth.

This possible limitation was pointed out by others previously.