That is merely conjecture on your part. I am optimistically certain that during the IsleChem and CRA testing phases a bible (laymen's term) was prepared for the rapid deployment of the processor.
that is why it's a start up in transition with all the *baggage* that accompanies it
that said ~ this is where ones' risk/reward and level of *comfort* comes into play
there is zero by way of guarantees and i'll never say never .. but based on every aspect i can verify .. to say nothing of understanding the *process* in play re: uplisting to the naz (and why WSB would be *8k'd*) the *opportunity* presented by JBI re: p2o is positively mind boggling *imo* for the coming 3 to 5 years
trite but true *imo* it's a ground floor opportunity which few ever get to *realize* and what was so revealing to me was the attendance no.s at the first AGM
attending a variety of shareholder meetings and listening to CC's across various exchanges (it becomes very obvious) what is SOP at each stage
like the share structure of JBII .. the no.s attending JBI's AGM .. would be envied by almost any other co. i follow *at this level* of the *process*
quote----- They have not prepared a construction package to build it, and the existing design is not optimized for Construction success. They are not on the brink of mass deployment where these issues become important. Far from it. ---------------
You just posted that the pictures were not complete.
You haven't seen a detailed system flow chart. You don't know any of the operational parameters of the system and what if any constraints they impose on the design. You haven't seen schematic of the plant layout as it presently exists.
In short, you have no basis to form a valid opinion.