InvestorsHub Logo
icon url

ichjw

07/16/10 11:30 AM

#57545 RE: Risicare #57543

Testing was being done in a Qualified lab, and all the
wiring appears to be uvolt instrumentation. Not a problem
icon url

Rawnoc

07/16/10 11:32 AM

#57547 RE: Risicare #57543

Testing was being done in a Qualified lab, and all the
wiring appears to be uvolt instrumentation. Not a problem
icon url

blind squirrel

07/16/10 11:41 AM

#57550 RE: Risicare #57543

You can claim whatever you want , but you don't know it's a serious or any code violation. Is the wiring in question line voltage or low-voltage signal wiring? If it is the latter, as it appears to be, it is not required to be housed in raceway (conduit or the like).

What is the point of making definite, negative statements when you don't have the facts?
icon url

Zardiw

07/16/10 2:29 PM

#57612 RE: Risicare #57543

Gimme a freaking break....that wiring job is top notch...all in conduits as can be plainly seen.....so there's a few sensor wires that they used for testing....so freaking what......z
icon url

Zardiw

07/16/10 3:02 PM

#57630 RE: Risicare #57543

Btw, you got the Code Violation for that??? I mean since it's serious and all...........z
icon url

Zardiw

07/16/10 10:35 PM

#57838 RE: Risicare #57543

Who said it was permanent???........They're in the TESTING stage remember.....how can anybody expect them to conduit everything while they're TESTING?.......hilarious........z