You best read that again. That suggests that every other alt. energy project concieved in the area, such as cpd's pipedream, would get online first, if at all. Minor upgrade is all that is needed to get connected. Look at the windfarm for example, how often have you seen a single video of a wind farm at max. output, I have never seen one, ever. There are always nearly half not even turning, and that is in good wind. What about when there is no wind. Same problem with solar. No wind, No sun, No Power. LLEG, on the other hand, Power 24/7. THANK YOU LLEG !!!!!!