mrogop

12/02/09 10:44 AM

#188724 RE: vineseeker2 #188721

vine


yep... pipe and string up the hole are necessary to maintain the integrity of the hole while drilling...they would not set production casing unless the obvious..would just P & A.

icon url

Sure

12/02/09 10:51 AM

#188725 RE: vineseeker2 #188721

The first step in drilling a well is to set your surface casing which acts as a guide for a straight drill stem. The only way to now 100% if there's oil is to drill to TD.
Sure
icon url

kownski

12/02/09 12:22 PM

#188738 RE: vineseeker2 #188721

Vine,
Conductor pipe is not needed on all rigs. On land rigs with earth pits or pits below ground level, there is no need for it.

Surface pipe is to protect fresh water zones and hold the BOP, on land. Hold BOP on offshore wells.

And I see Mrogop answered the rest.

John