I think people are waiting on October and an operational status for the plant. I do not think the 2 wells are high cost items. Strange things happen when a development company acctually brings a project on line. This is my 3rd in-out run through this company. In a longer view point, if they begin development drilling on phase II or on another property during 2010, then that will be a cash positive sign.
Been an interesting one to say the least, but; Wind power is green but geothermal power is "base load".