My thoughts also Dadd:>)
Monday, Jcanada said they (Sedco) liked about 300 ft and were drilling. IMO thats 24 hrs or less, trip out, log if they found anything to log, set a liner or pump cement and nipple down. Unless they found something they want to test, they should be about ready to get underway. Hope so!!
John