InvestorsHub Logo
icon url

greedy__malone

04/16/09 10:33 AM

#130 RE: righty #129

Business plan has some hints as to the direction

I would disagree based on the fact that they have no funding for their business plan and no idea if they will ever be able to find any funding.

Only other option would be to unload common shares into the market which would sink the pps in no time.

I would say there really aren't any hints in the business plan as they are unable to move on any plans they have to to lack of funding and liquidity. It's more of a business dream than a plan considering they aren't financially capable of moving forward with it.
icon url

Zardiw

04/17/09 3:09 PM

#133 RE: righty #129

Compensated Awareness Post View Disclaimer
GSAE is using the GOOD Vesta Wind Turbines. Right next door to me, they
put up 8 new 2.5MW Clipper Turbines. I've only seen them all turn ONE time.
Right now there's only 4 turning and they're Brand New...And the wind farm is owned by
British Petroleum....that's what you get for cutting corners....lol:

Belo Blato Summary
Supplier VESTAS V52
WTG Numbers 23
WTG Capacity (MW) 0.85
Nominal Power output (MW) - Installed Capacity 19.55
Capacity Factor (estimate) 40%
Full Load Equivalent hours pa (estimate) 3500
Energy Production (GWh) pa 68.43
Diameter (m) 52
Swept area per turbine (m2) 2124
Total Swept area (m2) 48,845
Hub Height 60
Tip Height 86
Cost per MW installed € 850,000
Cost per Turbine including part of SCADA € 722,500
Cost per Swept area (Eur/m2) € 340
Total Turbine price € 16,617,500
Design and Construction cost (estimate) € 1,661,750
Network Study cost (estimate) € 70,000
Grid Connection cost TBD
Service and Maintenance per turbine (Eur/year) € 12,750
Wind Farm Annual Service cost € 293,250
Base Case Scenario
Selling Price (Eur/MWh) € 100
Income for Energy Sales pa € 6,842,500

http://www.greenstarae.com



z