InvestorsHub Logo
icon url

vozmil

01/27/09 3:57 PM

#28918 RE: murdock #28885

"Laboratory analysis of a 6,580 kilo shipment of concentrate from the Escala's Phase I tunnels indicates 77.16 troy ounces of Silver per ton. Phase I's current tunneling is nearly fully complete to its initial planned depth of 30 meters. Applying typical reserves calculations to the Escala's 2 Meter wide, 1.5 Km long mineralized vein structure, the approximate in situ reserves are 9,000,000 tons at the present 30 meter depth."

I hope this analysis is from the tests report they have received from Canada. If it is so then it is appropriate for FMNJ to release complete report for public info. As we were told early last year that full operation of the mine is subject to positive results from that report. I can see from today's PR, they have reportedly started developing new shaft and tunnel. By having report in front of every body we can see what other metals were reported in the sample and in what quantity. That will help remove any doubt generated by simple statement about Silver content of the sample in today's PR. IMO