If that be the case, whereby the DOG has to put all the wells TIV is producing on the FTP site, then 4 of the 8 wells they drilled at PV last Winter/Spring are still not producing. I guess they are still being steamed/soaked/tested/steamed soaked/steamed/tested/steamed/soaked/steam/soaked/tested after 6 months of it. LOL
Well, I imagine the next time we hear in a PR about 10,000 BOED, or 100,000 BOED, by "next year" followed by a "blue sky wink", we'll all get another chuckle out of it. LOL
Geo