ERHE Controller, Odobulu
"He added that both Sinopec and Addax have found a drill ship, Abraham, for their respective blocks. He said the Abraham had been on a re-work and would sail to the JDZ this March."
WHOA guys and gals. I think the JDZ reference was an error. If indeed the Abraham re-work is finished in March 08 (which is a very real possibilty) remember that Kosmos gets it for 8 drilling slots before we do. The third quarter 2009 still stands imo, unless we can negotiate use of one of their slots for earlier drilling...thus the talk of a rig of opportunity - maybe thats where the JDZ reference comes from.
All my opinion.
dat