The big boys are coming.it will run hard with the small float.
The Company is on track to complete its vertical integration process and expects its zinc & aluminum galvanizing steel production system, which could operate both hot-rolled and cold-rolled coils, with a designed annual manufacturing capacity of 400,000 metric tons to become operational by the end of February 2008..."