6.3 Minimum Work Obligation a) Phase 1 – first 4 years: Contractor shall acquire/procure full 3-D seismic coverage over the block and drill one well. b) Phase 2 – next 2 years: Contractor shall drill an additional well. c) Phase 3 – next 2 years: Contractor shall perform geological and geophysical and engineering studies. Drilling of any wells is contingent on the results of the programme.