Maybe 3 weeks. They are doing doing a hole every 1.5 days - 30 holes in all. About 100 feet per hole. I have no idea how long local analysis will take (how busy they are).
My impression is the geology is complex, lots of hole to drill me thinks. Who knows.
I am a little surprised at the the low volume, and that is a concern.