"I think I can install a pressure septic system by a certain date, and have a road built, water, power and foundation built for the next customer in a weeks time, then Mr. Murphy comes in a really messes things up, and I guess I could be called a liar right along with Wilf, because I had to break my word and I did not get both jobs done on time. I had to fix the dump truck, then the crane used for setting the septic tank broke, and I am working 14-18 hours a day to be called a liar, not that I have, but just an analogy. This could be the same type of thing happening to Wilf, or he could just be giving us all a line, like the bashers say. I just cannot find out which is correct."
Right but you finished the job, even if it was late. The difference is no job here has been finished because what was promised was is most cases millions of dollars in treasure. This isn't about them being late excavating a site, it is about the sites not having anything of sufficient value period.