InvestorsHub Logo
icon url

kpf

01/18/04 4:45 PM

#23639 RE: sgolds #23637

sgolds

Yes I believe AMDs roadmap is indeed their best guess (although a tad on the optimistic side: It has a second generation 90nm process for end of 2005 on its map. (I read: 2006)
Now, a process node has to run at least two years to make money. 2006 + 2 = 2008. Sounds right to me, until then I would expect the transistor-geometries ready for volume production I assume are required to make 65nm manufacturable.

Anything else I'd like to see before I believe. It is possible anytime that you find gate oxides or modifications of current geometries to make it manufaturable earlier - but that i would consider a lucky strike which is nothing you can really predict, let alone put in on roadmap.

K.