InvestorsHub Logo

Replies to post #928 on Zinc

Replies to #928 on Zinc
icon url

Jang-A-Lang

05/16/07 5:24 PM

#929 RE: Lone Clone #928

Millstream Intersects a 47 Metre Interval of Massive Sulphides and Stringers in Drill Hole S-07-07 at Potter
Wednesday May 16, 9:00 am ET


TORONTO, ONTARIO--(CCNMatthews - May 16, 2007) - Millstream Mines Ltd. (TSX VENTURE:MLM - News; FRANKFURT:NJD - News) is pleased to report that its current diamond drill hole S-07-07 has intersected down hole a continuous mineralized zone over a core length of 47 metres (154 ft.). The mineralized zone contains stringers and massive sulphides showing chalcopyrite, sphalerite and pyrrhotite.
ADVERTISEMENT


Core samples have been cut, prepared and sent to Swastika Laboratories in Swastika, Ontario for assaying.

Millstream continues drilling to further explore this potentially rich volcanogenic massive sulphide (VMS) type deposit at its Potter Property. The past producing property is host to copper-zinc-cobalt "stacked" mineralized zones located in the highly prolific Abitibi Greenstone Belt in the Kidd-Munro Assemblage near the town of Matheson in north eastern Ontario, Canada.

Management has reviewed this report and press release with the company's consultant Edward Bettiol, P. Eng, and David Gamble, P. Geo, both being designated qualified persons for the property per NI 43-101.

The principle objective of Millstream Mines Ltd. is to enhance and develop known mineral properties to production potential.

Millstream seeks safe harbour with regards to forward looking statements.

56,921,040 SHARES ISSUED

May 15, '07 Close: $0.31

No regulatory authority or similar body approved nor disapproved the information contained herein.