InvestorsHub Logo
icon url

Saving Grace

03/12/24 8:08 PM

#18885 RE: Saving Grace #18883

Terrified Boogeyman Banks know, $1.2Billion invested, preparing for massive commercial operation.

A second Refinery is on site with everything in place. Hycroft Mining is transitioning to a massive commercial operation.

Hycroft is expected to have a workforce of over 500 when it's said a done. All infrastructure is prepared, in place and ready.











































Hycroft Mine Expansion Winnemucca, Nevada

SMG provided conceptual, final mechanical and structural engineering and design of belt conveyors including transfer structures and chutes. A fast-track schedule and changing priorities required quick SMG responses to complete engineering on schedule.


http://www.smgengr.com/material-handling-systems.html

A fast-track schedule and changing priorities required quick SMG responses to complete engineering on schedule.


Massive belt conveyors including transfer structures and chutes.


CEO Diane Garrett said; We have a tremendous amount of infrastructure already on site at Hycroft Mining Holding Corporation – infrastructure that, if planned and purchased today, would exceed well over a billion dollars. That advantage means we’re ahead of the curve of a typical developer.


https://www.linkedin.com/company/hycroftmining

SMG massive conveyor system.
http://www.smgengr.com/material-handling-systems.html

Hycroft Mining: Infrastructure and Equipment Owned by Hycroft



Bullish
Bullish