InvestorsHub Logo

iamadog

02/15/24 10:15 AM

#81241 RE: 1jk1 #81239

No matter what the News we are fucked . 4000 to 1 . CEO didn’t think twice . He obviously didn’t care about his shareholders.

drugmanrx

02/15/24 10:17 AM

#81242 RE: 1jk1 #81239

Based on today's news, this might not have been as speculative as I thought, only it is a now shame longs will not be the benefactors of the ride.

A 8 to 12 dollar share price and a 250,000 OS will not be lasting very long I am afraid!

drugmanrx

Re: None

Thursday, February 08, 2024 12:11:27 PM
Post# of 81239
Just so no one is confused the following is just fun speculation, not a claim it is happening or going to happen.

Sun Pacific Holding Corp
@SunPacificPower
1GW Solar manufacturing plant for an existing building as per suppliers $SNPW
- Equipment Delivery: 100 days after down payment received
- Shipment & customs clearance to project site: 50 days(expected)
- Installation: 30-45days
- Commissioning: 45-60days
- Ramp up: 30days.




January 12 to 14 2024 a site visit occurred at a long term secured location to lay out and design a US Solar Panel and battery manufacturing facility, to determine what equipment will be needed and where it will be located in the facility.

The data was taken back to SC Solar and Autowell to be analyzed. From the data a list of required equipment was compiled and a estimated cost to install the equipment was produced. The list of equipment needed and installation estimate were sent to the PT.IDN project manager (PM) for review. The process took about 2 weeks.

The Pt.IDN project manager reviewed the data with SNPW. After reviewing the data the two presented the data to the lenders for approval. Process taking about a week.

The Lenders thoroughly reviewed the data. After reviewing the data the lenders and being satisfied with the cost the lenders send an approval of the down payment to SNPW and PM to order the equipment . Process taking abut a week.

SNPW and PM sent out a down payment to purchase the equipment to SC Solar and Autowell. Process take very small part of a day.

While waiting for the ordered equipment to arrive SNPW and PM start retro filling the facility to get it ready to receive the equipment.100 days later the equipment arrives in the country.

50 day later the equipment arrives at the site.

Installation of the equipment at the pre prepped facility begins.

45 days later the equipment is fully installed.

60 days later the facility is commission

for 30 days ramping up takes place

November 23 2024 the US Solar panel and battery manufacturing facility is fully operational.