Replies to post #55224 on QS Energy Inc (QSEP)
zerosnoop
11/15/23 7:30 PM
#55229 RE: mr_sano #55224
Once all the parts were delivered for a full AOT, we assembled the stack and installed the stack into the vessel. The vessel was filled with oil and tested. We were able to apply full voltage of 40.1kV to the AOT. We believe the AOT is ready to test with customer oil and be deployed back into the field. Having achieved a positive hydrostatic test, we were able to have our final engineering call with a new potential development partner. We are currently seeking a contractual arrangement with a development partner to install and test the newly designed AOT. We have reopened discussions with our original development partner as well as reaching out to others.