InvestorsHub Logo
icon url

exisnet

08/07/23 3:22 PM

#14372 RE: stervc #14371

Drilling permits are in the process and could be issued at any moment.

It will be necessary for ABM to re-enter an oil and gas well or to drill a new well to obtain brine samples for analysis and metallurgical testing. Permits for such operations will be required from the BLM and the Utah Division of Oil, Gas and Mining. These permits are currently in process.

TECHNICAL REPORT SUMMARY