was likely from there. Tony’s cornbread ain’t done, but he ain’t that stupid….I don’t believe.
The brewery itself has four sections that are 9028 sq ft, 4760 sq ft, 4140 sq ft, and 975 sq ft.
There is also a 704 sq ft building that is not attached to the brewery. It looks like that’s where the equipment was unloaded in the video. You’re right, it wasn’t unloaded in the brewery itself.
I took a peep at the Stephenson Co tax records. The address.