Excelsior has 1 amazing mine that can be back on track very soon. It has also a second smaller mine that is close to start mining as well, with low capex and with a potential partner ( a subsidiary of Rio Tinto) And if for some crazy reason well stimulation doesn’t work as planned, Excellsior will build an open pit .