NRG Rail
As we’re coming online, we will be transloading until we begin phase 1 of the terminal construction. We have 18 Rail spots, 9 dual-sided towers, and 1.2m gallons of storage approved and permitted. Phase 1 begins with 5 towers, 360k gallons of storage, and two loading racks installed in '22. At that time, the transloader will be retired and the operation will commence operating as a Liquefied Petroleum Gas terminal.


This was one of the questions I ask, how was the terminal construction coming along?