I think the advice and guidance will keep him busy Shouldbe. Dunn, Kness, and Russell will be generating inputs/assumptions and the financial team will be building massive spreadsheets with all the assumptions, timing, cash flow, and the NPV calc.
I would love to have heard news of trucks too. Or a large flare. But the flow portion of the tests don't last long; maybe two days out of the last 5 months.