InvestorsHub Logo
icon url

KyOil

08/03/22 9:52 PM

#50429 RE: alancg #50427

I suspect several tankers have hauled oil and water away during DST.

note: DST is Drill Stem Test which is how the test is done. Flow rates (gas,oil,water) and well head pressure is what is being measured.

We don't know MJ02's flow rate nor how long the flow portion of the DST is. For illustration, lets assume the total liquid flow rate is 2000 barrels/day. Then a one day flow test would require about 7 semi tankers at 280 barrels each.