InvestorsHub Logo

KyOil

06/07/22 9:34 AM

#49387 RE: Whistleblower7 #49384

Yes, they have had time to size the reservoir with some degree of confidence.

It was sized when 3D was complete and before MJ02 was drilled, sized again when the logs were ran in MJ02, and the size has been verified with DST which I believe is now complete.

They could have issued a PR with the reservoir size at any of these points in time. Doesn't mean they will after DST as they did not after 3D and logs.