The following upgrade processes have begun and are being made to the Marion, NC bottling and beverage plant:
Adding a new roof to the building Adding solar panels for efficient energy use and cost savings Replacing the North Cove Springs roadway sign with a new Greene Concepts sign Re-paving of the roadway, driveway and parking lot Adding a new ceiling to the cargo doors Adding an additional high-speed bottling line to increase production