very good
i'm obviously not an oil man but it sounds very good- kyoil and yourself indicating they've gone steps beyond the previous well -
they've certainly had a lot of firsts-its ironic we've seen the lowest pps ever with this well while their experience and firsts and equipment etc are greater than ever before, including their 1st 3d,the largest terrestrial 3d in Israel-and very possibly are closer to the goal than ever before
How long do you oil guys think it might be before they are in a position to realize or size a reservoir-
"The BOP being removed says the completion liners are in, the well bore is secured and ready for perforation and stimulation once the xmas tree is installed on the wellhead. What was confirmed during mud logging must have presented such compelling evidence that this well needed to be completed"
i'm hopeful based on kyoil and this and the principles of faithfulness- unless this is a bigger weeding of the wheat and tares than even i imagined
what is P50?