InvestorsHub Logo

Quick Sand

04/01/22 5:20 PM

#52216 RE: ZUPS #52213

I doubt we will see it at this stage.

Probably some BS excuse of “proprietary information “

mr_sano

04/01/22 10:03 PM

#52218 RE: ZUPS #52213

Now they are blaming the material they used internally “swelling up”! Jesus what could go wrong…did they build this from crap they bought at the hardware store? This is a shell game and it’s impossible for investors to pick the right cup!

zerosnoop

04/01/22 10:40 PM

#52219 RE: ZUPS #52213

The PROVEN AOT works as per the FACTS in the public filings. All previous issues RESOLVED

We believe that real-world data from our AOT project may be used to accelerate our desire to achieve commercial adoption of our AOT technology, positioning us to re-engage with industry executives.

The results of the electrical testing of the insulating material showed that the material is functioning as designed.

New materials were sourced and tested as potential replacements. A couple of new materials have been found that offer improved stability when submerged in crude oil for extended periods of time.
















zerosnoop

04/01/22 10:55 PM

#52224 RE: ZUPS #52213

Based on the confirmation of these most recent and positive results using the fully assembled AOT, a medium gravity pipeline spec oil (API 23) was procured and pumped into the AOT. We ran the AOT with the reworked original grid pack for an hour at 10 kV and saw no anomalies and no short circuits, confirming our belief that the short condition was a result of failed insulation. We were then able to apply 20 kV to the oil despite utilizing a reworked original grid pack. This high voltage result seems to demonstrate that we have solved the problems reported in June of 2020. Subsequent testing in the laboratory showed the oil (API 23) would support a voltage of 40 kV. Between the laboratory data and issues found during recent component testing we are in the process of confirming the final design criteria for a new grid pack which represents the remaining 20% necessary for full treatment effect.





















zerosnoop

04/01/22 11:06 PM

#52228 RE: ZUPS #52213

Our demonstration partner has indicated their continued interest in our AOT technology and may consider installation and operation of a new AOT demonstration project if our operational issues can be resolved.